Project Details

Project Description

FTE design team members were responsible for the preparation of the full sets of practice football playing field construction documents which included the following plan preparation: layout dimension and material plans, surface grading plans, underdrain collection system, irrigation system, and playing field recovery time calculations, associated construction details and complete written specification in accordance NFL standards.

The practice playing fields have been designed to meet the U.S.G.A. and ASTM high performance sand based rootzone guidelines. The sub-surface underdrain collection system will alow for the playing fields to recover quickly after receiving frequent local historical rain fall intensities.

FTE design team members also provided QA/QC shop drawing review and approval of all the necessary materials and soil testing data to insure this high performance playing field was constructed in accordance with the approved project construction documents and specifications.

*Key FTE members provided these services during employment with another firm.

Tampa Bay Buccaneers – (NFL) Training Facility

Tampa, Florida

  • Role : Playing Field Consultants
  • Owners: Tampa Sports Authority
  • Status : Completed 2006

Reliant NFL/Rodeo Multi-Use (NFL) Stadium

Houston, Texas

  • Architect : Populous (Formerly HOK Sports)
  • Role : Playing Field Consultant
  • Status : Completed in 2002

Heinz Field (NFL) Stadium

Pittsburgh, Pennsylvania

  • Architect : Populous (Formerly HOK Sports)
  • Role : Playing Field Consultant
  • Status : Completed in 2001

Copyright © FTEsports 2017
All rights reserved. Privacy Policy.